Water/Mold damaged cabinets/flooring. Complete floor replacement of all drywall, flooring, cabinets, appliances ect...
Bathroom Remodel
Replaced the old vanity, countertop, tile flooring, and changed the tub surround from cultured marble to tile.
Shower Remodel
Originally had a bathtub with a cultured marble surround which was removed by others due to a water damage. The tub was replaced with a walk in tile shower with matching flooring
Flooring Replacement
Flooring and Counter top replacement was performed. Original Cabinets were reused. Several of the lower cabinets were rebuilt using the original face frames due to a water leak.